It was a very busy year and it started with the design of this house and the commencement of construction in the spring.

Hauling rebar with the excavator is so much nicer that moving it by hand.

We used a fabric membrane with our footing to prevent water from wicking up into the footing in the future. It also has the benefit of keeping our forming wood clean so it can be reused and have less waste.

A closeup of the membrane.

The rebar is in the footing and it’s all ready for the concrete pour.

Pouring concrete using the boom pump.

Rudy is using a screed to level the concrete.

Our day of pouring concrete is finished.

The forms are cleaned and everything is tidy.

The footings are done and ready for layout of the walls.