Ravine House Footing and Wall construction

rammed-earth-footings

Batter boards are being leveled and placed for the footings. Wide footings can support the heavy walls but also act to give seismic stability and make a bond beam unnecessary.

rammed-earth-footing-steel

Steel is in place and the footings are ready for concrete.

ravine-house-forming-column

Forming the first column.

rammed-earth-ramming-column

Ramming the column.

rammed-earth-column

Fidel admires the first column on the house, it is one of two at the entrance that are 12′ tall. It is wet as the forms have just been removed and will turn pink as the column dries.

ramming-walls

Ramming one of the 12′ entrance walls on a beautiful sunny day.

rammed-earth-walls-tall

A couple of 8′ rammed earth pillars with the 12′ entry walls in the background.

rammed-earth-corner-wall

Making a corner wall section.

rammed-earth-tamper

A mechanical rammed earth tamper on loose material with the isulation showing.

rammed-earth-infill

Ramming an infill, a window will go above this section.

rammed-earth-kitchen-wall

Green rammed earth for the kitchen wall.

rammed-earth-pillars-layers

These are some of the nicest rammed earth pillars ever! A big statement yes, but true. The layering and texture of these pillars isĀ fabulous, the picture doesn’t fully capture the feeling in real life.

corner-wall-completed

After the last corner wall isĀ completed.

rammed-earth-complete

The rammed earth is complete! It was an epic journey and very rewarding.

Tags: , , , , , , , ,

This entry was posted on Friday, December 12th, 2008 at and is filed under Ravine House. You can follow any responses to this entry through the RSS 2.0 feed. Both comments and pings are currently closed.

Comments are closed.